yabacaba

Bathroom Remodeling and Drywall work

Martian 033
Martian 034

Above: Installed a 36” shower, toilet, sink and wainscot/trim flooring

Below: Installed a 60” Shower, toilet, vanity w/ top, wainscot/trim and flooring

BuiltWithNOF
Martian 041
Martian 038

Insulation-Drywall work

Shunk 021
Shunk 022
Shunk 028
Shunk 020
Shunk 024

Both rooms closets were framed, insulation installed, doors installed walls ceilings were rocked / finished and primed

[COGANWORKS] [Latest Work] [Bath Remodels] [Doors Windows] [Building] [Contact Us]